This is the final part of a 3 part series looking the New England Clean Energy Connect Project. This episode looks at Hydro-Quebec and a handful of their largest hydroelectric facilities; The Beaurharnois, The Bersimis, The Manic-Outardes, The Romaine and James Bay Projects. The episode also looks into the environmental cost of this type of clean energy for the local environment and for the entire region.
Find episode show notes & sources here
This episode takes a look at the 5th attempt within the legislature to remove the 100MW cap protecting Maine's renewable energy sector from competing...
Posted On: 11/2/2020 On the first episode of the Maine Polis Podcast we take a closer look at Sara Gideon's record in the Maine...
This episode is the first part in a series looking at the New England Clean Energy Connect Project. In this part, we look at...